01 Weld the structural beams and apply layers of blown-in insulation.
02 Installation of electrical and hydraulic systems along with sheetrock/wall.
03 Polyurethane blow-in insulation is applied and covers all of the systems to keep a tight seal, decrease movement and prevent leaks.
04 Installation of sheetrock ir durock/
05 Plaster & final details.